North European natural gas pipeline, Hittbergen-Achim section


Developer

E.ON Ruhrgas AG, Essen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 128 KByte

Project

  • Construction of a long-distance natural gas pipeline DN1.400 / DP100
  • 187 km
  • Continuous recording of water levels for evidential purposes

Our services

  • Sinking of core drill holes
  • Installation of 120 groundwater measuring points
  • Equipping all measuring points with data loggers
  • Continuous evaluation
  • Sampling of measuring points and drainage processes as well as disposal points
  • Analysis, sometimes by field laboratory
  • Documentation
   

Upgrade to Leipzig – Dresden line, Weißig-Böhla section,
km 79.05 LD to km 25.20 DE


Developer

DB ProjektBau GmbH, Dresden project centre

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 183 KByte

Project

  • Linkage of the Leipzig – Dresden and Dresden – Elsterwerda railway sections
  • Extraction of loose-fill mass from the Medessen borrow pits
  • Groundwater and outflow monitoring

Our services

  • Execution period 2002 to 2010
  • Compilation of the groundwater and discharge conditions for the uninfluenced conditions (initial condition)
  • Creation of the technical measuring requirements for the performance of monitoring
  • Groundwater sampling and chemical analyses for evidential purposes
  • Groundwater and discharge monitoring in the area of the Medessen borrow pits and the whole modification section (30 monitoring operations)
  • Quarterly evaluations with a description of the effects on groundwater and discharge condition
   

Landesnahverkehrsgesellschaft Niedersachsen mbH, LNVG, Hanover


Developer

Heath railway, 3rd construction phase: Soltau - Buchholz

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 133 KByte

Project

  • The stretch of the heath railway between Soltau and Buchholz i.d.N. (km 87.967 to km 133.271), currently travelled at v = 80 km/h (approx. 45 km), is being upgraded to handle v = 120 km/h

Our services

  • Geotechnical analyses of the current situation
  • LAGA declaration of the existing ballast and analyses for BoVeK purposes
  • Subsoil evaluation and geotechnical consulting pursuant to HOAI § 92
  • Creation of 12 groundwater measuring points
  • Performance of level measurements and evaluation of the measurement results
  • Hydrogeological assessment for the purposes of safeguarding planning and realising the construction project
   

Nordmainische S-Bahn
Rhein/Main, Station FfM-Ost


Developer

Deutsche Bahn AG, Frankfurt

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 251 KByte

Project

  • Building a 2-track S-Bahn section from FfM Konstablerwache via FfM Fechenheim, Maintal to Hanau main railway station, over a total length of 19.535 km
  • Approx. 2.0 km of the section runs in two tunnels to be worked systematically
  • FfM-Ost station, 25 m below site surface, width 23 m, length approx. 240 m

Our services

  • Hydrogeology report on section and tunnels
  • Analytical assessment of groundwater banking
  • Devising a digital groundwater model to assess banking and receding of water level due to tunnel and station
   

Karstadt Leipzig,
new construction


Developer

Karstadt Immobilien AG & Co. KG, Essen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 115 KByte

Project

  • ew construction of a shopping centre over 5 storeys with 3 underground car parking levels
  • Foundation ditch approx. 12 m deep in the Leipzig city centre area
  • Foundation in pierraille over brown coal stratum in groundwater, as combined pillar-spread foundation
  • Underpinning of historic facades and neighbouring buildings, enclosing foundation ditch with subterraneous curtain 400 m long up to 30 m deep
  • Subsequent undercutting of city tunnel using shield driving method

Our services

  • Investigation of subsoil, advice on foundations
  • Groundwater modelling
  • Preliminary planning of enclosure for foundation ditch
  • Application in relation to water laws
  • Estimate of influence on lowered water level due to tunnel driving
  • Advice on removal of 80 leader anchors in the subterraneous curtain run
  • Assessment of the influence of hydraulic banking on neighbouring construction
   

New construction of an S-Bahn tunnel in Leipzig city centre between Leipzig railway station and the Bayerischer Bahnhof station


Developer

S-Bahn-Tunnel Leipzig GmbH, Leipzig

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 105 KByte

Project

  • Underground electrified track connection, length approx. 3.5 km, of which approx 2.6 km worked systematically
  • Two single-track tunnel pipes, external diameter 8.8 m, spacing 0.5-1 diameter
  • 4 underground stations
  • Tunnel construction over practically the entire length below the groundwater table
  • Groundwater communications units during the construction period and as permanent installations

Our services

  • Groundwater monitoring
  • Investigation of geohydraulic parameters
  • Groundwater modelling to assess the effects of the construction measure on the geohydraulic conditions, multi-aquifer model of several quaternary and tertiary groundwater runs
  • Planning recommendations to minimise influences on the groundwater regime
  • Design and planning of groundwater communications units
  • Application in relation to water laws
  • Assessment of the influence of hydraulic banking on neighbouring construction
   

New construction/Conversion of the four-lane traffic node on the Südring—Neefestr., Chemnitz


Developer

Ingenieurbüro Vössing GmbH

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 84 KByte

Project

  • Conversation/New construction as a partly level-free transport intersection with three levels of traffic
  • Underpass up to approx. 8 m below the current site
  • Subsoil comprising former water meadow and Rotliegendes tufa with uneven groundwater regimes
  • Two spanned groundwater stockworks
  • Construction measure crosses the direction of flow of the groundwater

Our services

  • Investigation of subsoil, recommendation on foundations and examination for polluted areas
  • Groundwater examination, calculation of construction water raising and estimate of impacts on the construction measure
  • Devising and calibrating a groundwater model, testing the lowering of groundwater during the construction period and forecast of possible occurring banking following completion, hydrogeological instructions for dimensioning water raising and possible drainage requirements following completion
  • Information on suitability for securing permission under the water law provisions
   

Software for designing and dimensioning foundation ditches for drainage


Auftraggeber

Harbourdom AG, Köln

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 62 KByte

Project

  • Preliminary surveying of the radius for deployment
  • HERTH/ARNDTS-based procedure
  • Multi-well formula based on Forchheimer
  • Time-referenced calculations using the multi-well formula
  • Open water raising based on Davidenkoff
  • Taking sheet piling into account
  • Vacuum well
  • Rectangular and variously-edged foundation ditches
  • General foundation ditch outlines as polygons
  • Complex foundation ditches with different base heights
  • Multiple foundation ditches

Our services

  • Preparation of calculation procedures for groundwater hydraulics using algorithms
  • Implementing calculation procedures
  • Devising the user interface, with graphic evaluation
  • Software testing
  • Documentation and handbook
   

Hydrogeological investigations


Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 155 KByte

Own initiative

  • Planning and carrying our hydrogeological charting, water recording, documentation of sources and their collection areas
  • Planning and monitoring the establishment of groundwater metering points; carrying out hydrogeological field tests to determine aquifer key data (pump tests, tracers, percolation tests etc.)
  • Hydraulic calculations, water balance sheets, calculating the influence of various subterranean construction measures on groundwater regimes
  • Groundwater modelling, 2D and as 3D finite elements model
  • Determining the influence of soil contaminations above and below the groundwater table on existing groundwater regimes Calculating and modelling transport of contaminants, site-dependent and time-dependent, forecast calculations
  • Cost/benefit analysis of above measures with regard to economic construction
   

Construction method to protect groundwater


Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 145 KByte

Own initiative

  • The priority is the economic minimisation of interventions into the natural groundwater balance;
  • Avoiding extensive lowering of groundwater levels due to water extraction measures; devising hydraulic and construction concepts to instate construction works protected by water-tight foundation ditches;
  • Avoiding backing up due to construction works in aquifers, supplementary measures such as groundwater communications units;
  • Preserving the natural flow of groundwater, supplementary measures such as groundwater communications units;
  • Cost/benefit analysis of above measures with regard to economic construction
   

Renewal of bridge in the
Riesa station rail section


Developer

DB ProjektBau GmbH, South-East branch, PZ Dresden

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 113 KByte

Project

  • Eliminating all same-level crossing points involved construction of a road underpass
  • The pan construction works extend as far as the groundwater runs
  • Water raising during the construction period of watertight enclosure of the foundation ditch
  • Groundwater communications units during the construction period and as permanent installations

Our services

  • Reports on subsoil and construction materials
  • Advice regarding foundations
  • Tendering for and monitoring of investigative works
  • BoVek investigations
  • Groundwater modelling to assess the effects of the construction measure on the geohydraulic conditions, multi-aquifer model
  • Planning recommendations to minimise influences on the groundwater regime

nach oben TOP

 
Dr. Spang GmbH

Witten

Phone: + 49 (0)2302 - 9 14 02 -0
Fax:  + 49 (0)2302 - 9 14 02 -20
E-Mail zentrale@dr-spang.de

Esslingen/Neckar

Phone: + 49 (0)711 - 351 30 49 -0
Fax:  + 49 (0)711 - 351 30 49 -19
E-Mail esslingen@dr-spang.de

Freiberg/Saxony

Phone: + 49 (0)3731 - 79 87 89 -0
Fax:  + 49 (0)3731 - 79 87 89 -20
E-Mail freiberg@dr-spang.de

Nuremberg

Phone: + 49 (0)911 - 9 64 56 65-0
Fax:  + 49 (0)911 - 9 64 56 65-5
E-Mail nuernberg@dr-spang.de

Naumburg/Saale

Phone: + 49 (0)3445 - 76 21 53
Fax:  + 49 (0)3445 - 76 21 62
E-Mail naumburg@dr-spang.de

Download

Project descriptions

  • North European natural gas pipeline, Hittbergen-Achim section
    Dr. Spang GmbH PDF, 128 KByte
  • Upgrade to Leipzig – Dresden line, Weißig-Böhla section, km 79.05 LD to km 25.20 DE
    Dr. Spang GmbH PDF, 183 KByte
  • Landesnahverkehrsgesellschaft Niedersachsen mbH, LNVG, Hanover
    Dr. Spang GmbH PDF, 133 KByte
  • Nordmainische S-Bahn Rhein/Main, Station FfM-Ost
    Dr. Spang GmbH PDF, 251 KByte
  • Karstadt Leipzig, new construction
    Dr. Spang GmbH PDF, 115 KByte
  • New construction of an S-Bahn tunnel in Leipzig city centre between Leipzig railway station and the Bayerischer Bahnhof station
    Dr. Spang GmbH PDF, 105 KByte
  • New construction/Conversion of the four-lane traffic node on the Südring—Neefestr., Chemnitz
    Dr. Spang GmbH PDF, 84 KByte
  • Software for designing and dimensioning foundation ditches for drainage
    Dr. Spang GmbH PDF, 62 KByte
  • Hydrogeological investigations
    Dr. Spang GmbH PDF,155 KByte
  • Construction method to protect groundwater
    Dr. Spang GmbH PDF, 145 KByte
  • Renewal of bridge in the Riesa station rail section
    Dr. Spang GmbH PDF, 113 KByte