Environmental protection
Selected reference projects
Support in recovery from mineral oil damage, Ennepetal
Developer
Geisler GmbH, Unna

Download the project description
PDF, 764 KByte
|
Project
- Renewal of filling stations in Ennepetal
- Filling station at Marktkauf, Kölner Str. 311
- Organoleptically conspicuous soil was found in the course of replacement of the existing underground tank
Our services
- Expert support for earthworks
- Analysis of the soil contamination and determination of the need for action
- Analysis of the residual pollution on the site
- Evaluation of the necessary excavation and backfilling requirement
- Notification to the competent soil protection authorities of Ennepetal district
- Documentation to the above authority of the works carried out
|
| |
|
Former large chemicals store in Trier, Servaisstr. 57
Developer
DB Netz AG, Saarbrücken

|
Project
- Evidence of highly volatile halogenated hydrocarbons
- The property is approx. 3,540 m² in size
- It was originally used by Deutsche Bahn as a repair and improvements facility, then the grounds were used for the storage and transfer of industrial chemicals
- The grounds were last used as a operating facility with combined office and storage building
Our services
- Evaluation of 5 contaminated areas
- Detailed analysis of highly volatile halogenated hydrocarbons for the pathways of air at ground level, solids and eluate
- Risk assessment
- Seepage prognosis pursuant to federal soil protection regulations
- Obtaining of cable layout/pipeline plans from third parties and ordnance information
- Cost estimate for redevelopment
|
| |
|
Expansion of spoil dump in "Schledde" quarry, Hemer
Developer
Stricker-Weiken GmbH Co. KG, Warstein

Download the project description
PDF, 834 KByte
|
Project
- Stabilization of the spoil dump in the "Schledde" quarry in Hemer
- Dump expanded by approx. 2 ha to a total surface area of 4 ha
- Measures to establish a stable dump
Our services
- Subsoil analyses
- Stability investigations pursuant to DIN 4084
- Planning and development of measures to improve the stability of the dump
- Concept design and surveying of a settling and retention basin as a receiving and settling basin for eroded soil material
- Laboratory tests to determine the installation criteria
- Measures to prevent soil subsidence close to the surface and slaty erosion
|
| |
|
Rote Halde landfill, Iserlohn-Letmathe
Developer
Lobbe Abfall GmbH, Iserlohn

Download the project description
PDF, 887 KByte
|
Project
- Sealing of a soil and buildings materials landfill site of DKI
- Establishment of the surface seal comprising bentonite mat, drainage layer and recultivated soil
- 54,000 m² largely with incline of 1:3, in some areas with incline 1:2; in these areas tensile forces must be absorbed and diverted by geogrids
Our services
- Planning, quality assurance and project coordination
- Expert technical consultancy
- Supervision of works
- Preparation of the tender documents, QA plan and geotechnical evidence
- Support for self-supervision of the installer
- Geotechnical laboratory tests
- Concept design and planning of construction water drainage system
|
| |
|
Dismantling of an engine hall
with administrative annexe in Freudenstadt
Developer
DB Services Immobilien GmbH, Karlsruhe

|
Project
- Dismantling of a former engine hall with two assembly pits
- Length 85 m, width 13 m
- Dismantling of an administrative building
- Length 85 m, width 6.5 m
Our services
- Environmental inspection
- Cursory analysis of the subsoil
- Waste analyses of the building fabric of both structures
- Reports for soil and building fabric
|
| |
|
Solingen electronic signal box,
1st construction phase
Developer
DB AG, Western Region via DB ProjektBau GmbH, Cologne

Download the project description
PDF, 161 KByte
|
Project
- The area under examination is located on track section 2730, km 0.020 to 26.600 between the stations of Gruiten and Cologne- Mülheim
- Dismantling of old and construction of new rail facilities
- New cable run
- Technical modifications
Our services
- Subsoil analysis during construction
- Expert monitoring
- Environmental coordination
- Foundation works consultancy
- Sampling
- Declaration analyses
- Classification of building fabric for recycling
- Preparation of recycling and disposal concepts
|
| |
|
Düsselpark, Gerresheim South, Düsseldorf
Developer
City of Düsseldorf, environment agency

Download the project description
PDF, 142 KByte
|
Project
- Development plan 5976/025 for the former grounds of the Gerresheim glassworks
- Area approx. 12 ha
- Investigation programme for approx. 270 core soundings and dynamic probings in a grid of 30 m
- Urban redevelopment concept with residential and commercial properties and a park through the exposure and configuration of the Düssel river running through it
Our services
- Subsoil investigation and technical evaluation of the native backfills and grown soil
- Foundation works consultancy for urban sewerage and drainage infrastructure
- Roadbuilding measures and use as envisaged in the development plan
- Dismantling and disposal concept for the existing industrial structures
|
| |
|
ESV sports ground, Östingstraße, Hamm
Developer
Federal Office for Railway Assets, West Region, Essen office

Download the project description
PDF, 161 KByte
|
Project
- Preparation for the sale of a property of size approx. 20,000 m²
- The property, which is used by ESV Hamm, is being sold by the Federal Office for Railway Assets
- Determination of the consequential soil costs in respect of contamination and soil/waste
Our services
- Detailed investigation of inherited liability, modules I (contaminated sites) and II (waste/soil)
- Elaboration of analysis concepts for the individual FRIDU modules
- Inspection planning
- Subsoil investigation
- Chemical analyses
- “Risk assessment” expert report, detailed investigation level
|
| |
|
Limitation of contamination following a freight train accident
Developer
DB Netz AG, Southwest Region, Stuttgart

|
Project
- Freight train accident in Stuttgart-Untertürkheim (Deckerstr. / Augsburger Str.) on 15.03.2010
- Soil contaminated by damaged tank wagon (diesel)
- Approx. 300 - 400 l of diesel fuel escaped
- The accident was located in the heart of the mineral spa protection zone at the edge of the Neckar floodplain
Our services
- Risk assessment
- Investigation to limit the extent of the damage
- Subsoil analysis, 7 core soundings
|
| |
|
Expanding the central sewage plant, Freiberg
Developer
City of Freiberg, waste water disposal services

Download the project description
PDF, 281 KByte
|
Project
- Subproject to clear a site in order to create a rainwater retaining basin in the Münzbach valley
- Demolition of 7 buildings, one chimney and other paved external installations (e.g. loading ramps, roads) over a total area of approx. 1.4 ha
Our services
- Research of historical documents regarding previous construction
- Investigations of existing building fabric / materials for pollutants
- Preparation of a demolition and disposal concept with determination of the quantities of building materials requiring separation
- Determination of the disposal routes for building fabric requiring particular monitoring (e.g. asbestos, PCBs, tar cork, etc.)
- Elaboration of the necessary documents for approvals and consents
- Cost estimate and calculation of construction times
- Preparation for award of contract
- Assistance in award of contract
- Construction supervision
|
| |
|
Building project in the Grusonsstrasse, Frankfurt am Main, 2. BA
Developer
Groß & Partner Grundstücksentwicklungsgesellschaft mbH, Frankfurt am Main

Download the project description
PDF, 89 KByte
|
Project
- Demolition of a former station building and ancillary building between the railway cutting on the Frankfurt-East – Hanau section and the Danziger Platz
- New construction of a 6-storey business premises
- Area 105 x 45 m
- Basement construction on new building depending on subsoil condition, 1 o2 2 basement levels
Our services
- Investigation concept
- Investigation of subsoil
- Report on environmental engineering
- Demolition and disposal concept
- Recommendations for foundations and for controlling groundwater
- Environmental engineering examination and assessment of the soil and the fabric of the building for existing pollutants
- Assessment of subsoil and advice on foundations
|
| |
|
Change of use for Kleff sewage treatment works, Witten
Developer
Ruhrverband, Essen

Download the project description
PDF, 260 KByte
|
Project
- Change of use from sludge drying sites and basins to residential use
- Area recycling of a sewage treatment sludge drying facility, taking account of LAGA and BBodSchV, with renovation and change of use for 6 former sludge drying basins
Our services
- Historical investigations, initial assessment
- Inspection of plans and elevations for mines
- Risk assessment, investigation of renovation works
- Site assessment with a view to planned change of use
- Planning for renovation, encapsulating using Trisoplast sealant liner
- Drawing up and monitoring an investigation programme
- Support during renovation
- Third-party monitoring of landfill construction
- Identifying soil contaminations
- Determining the risk potential to groundwater, soil air, soil
- Renovation concepts
- Planning for readying site for construction, and renovation
|
| |
|
Institut für Zuverlässigkeit und Mikrointegration (IZM), Technopark Chemnitz
Developer
Fraunhofer Society, Munich
Download the project description
PDF, 150 KByte
|
Project
- Building a research institute for nanotechnology with increased expenditure for foundations (dampening vibrations)
- 35 x 35 m area, 4 storeys, cellar level with connecting access to neighbouring building
Our services
- Subsoil report with settlement calculations
- Proof of slope failure
- Dimensioning of water raising during the construction period
- Authorisation under water laws
- Demolition and disposal concept for the old buildings
- Energy use of a deep well concept
|
| |
|
Investigation of renovation works
to the former Bebbelsdorf quarry, Witten
Developer
Ennepe - Ruhr - Kreis, Schwelm
Download the project description
PDF, 143 KByte
|
Project
- Covering 5 sandstone faults in a ridge of hills, filled during the period 1962 to 1971 with building rubble and domestic waste, and individual faults in the rock also being filled with industrial waste from hard coal working, producing a total of approx. 100.000 m³ of infill
- Pollutants: significant contamination with polycyclic aromatic hydrocarbons (PAH), phenols, PCBs and heavy metals, in part with significant methane gas formation
- Discharges of pollutants via percolation water and groundwater have been demonstrated
Our services
- Investigation of prior pollution with stages for Historical Investigation, Technical Investigation (Risk Assessment)
- Comprehensive supplementary risk assessment for renovation
- Subsoil investigation using 2,000 m core drillings and test drillings pursuant to DIN 4021
- Taking samples
- Chemical soil, groundwater and soil air analysis
- Devising renovation proposals
|
| |
|
Renovation of the waste
heap complex 271 in Aue
Developer
Saxony Land Office for the Environment and Geology
Download the project description
PDF, 92 KByte
|
Project
- Final design of the waste heap including associated roads, paths, waterways and landscaping construction
- Volume totalling 13.7 million m³ and a footprint of approx. 67 ha
Our services
- Third-party monitoring of quality-appropriate execution of renovation of the heap and bringing into reuse
- Monitoring execution of the object for compliance with the permission on radiation protection and respecting state of the art for construction of paths, waterways and landscaping
- Checks on re-storage and profiling works, determining the degree of grouting, the degree of grouting including permeability coefficients and particle distribution, proof of suitability of the covering layers, applying the covering layers to the embankments and parts of the plateau and extending percolation water catchments
|
| |
|
Area recycling of a
sewage treatment plant sludge
drying facility – renovation and
reuse of 6 basinsAuthors
Autoren
Dipl.-Ing. Axel Sommerfeld, Essen Dipl.-Ing. Christian Spang und Dipl.-Geol. Gerhard von Zezschwitz, Witten
Expert article
PDF, 2480 KByte |
Fachartikel
- The Ruhrverband, Essen, used a site of approx. 60.000 m² on the Kleff road in Witten as a sludge drying site for the Witten sewage treatment works, situated alongside the Ruhr. The 6 basins were investigated for planned reuse for residential housing between 2001 and 2005, with the result that in one infilled basin (Basin 6) very high levels of organic pollutants (EOX, BTEX, PAH) were found, together with back-fill at the bottom of the emptied Basins 1 to 5, in some places with significantly increased levels of PAH and heavy metals. Due to the total volume of over 44,000 m³ of chemically contaminated back-fill materials, the site is to be made ready for building by local restorage and securing or through removal of materials with lower pollution levels. Renovation of the site includes securing (encapsulating) the more heavily contaminated back-filling materials in Basins 5 and 6. A surface seal was created over the two basins using Trisoplast, over an area of approx. 8,000 m². The sustainability of the renovation is checked using groundwater monitoring.
Read the full article:
PDF, 2480 KByte
|
TOP
|
|
|
Witten
Phone: + 49 (0)2302 - 9 14 02 -0
Fax: + 49 (0)2302 - 9 14 02 -20
zentrale@dr-spang.de
Esslingen/Neckar
Phone: + 49 (0)711 - 351 30 49 -0
Fax: + 49 (0)711 - 351 30 49 -19
esslingen@dr-spang.de
Freiberg/Saxony
Phone: + 49 (0)3731 - 79 87 89 -0
Fax: + 49 (0)3731 - 79 87 89 -20
freiberg@dr-spang.de
Nuremberg
Phone: + 49 (0)911 - 9 64 56 65-0
Fax: + 49 (0)911 - 9 64 56 65-5
nuernberg@dr-spang.de
Naumburg/Saale
Phone: + 49 (0)3445 - 76 21 53
Fax: + 49 (0)3445 - 76 21 62
naumburg@dr-spang.de
Download
Project descriptions
- Support in recovery from mineral oil damage, Ennepetal
PDF, 764 KByte
- Expansion of spoil dump in "Schledde" quarry, Hemer
PDF, 834 KByte
- Rote Halde landfill, Iserlohn-Letmathe
PDF, 887 KByte
- Solingen electronic signal box, 1st construction phase
PDF, 161 KByte
- Düsselpark, Gerresheim South, Düsseldorf
PDF, 142 KByte
- ESV sports ground, Östingstraße, Hamm
PDF, 161 KByte
- Expanding the central sewage plant, Freiberg
PDF, 281 KByte
- Building project in the Grusonsstrasse, Frankfurt am Main, 2. BA
PDF, 89 KByte
- Lütgendortmunder Hellweg site, Bochum
PDF, 122 KByte
- Change of use for Kleff sewage treatment works, Witten
PDF, 260 KByte
- Institut für Zuverlässigkeit und Mikrointegration (IZM), Technopark Chemnitz
PDF, 150 KByte
- Investigation of renovation works to the former Bebbelsdorf quarry, Witten
PDF, 143 KByte
- Renovation of the waste heap complex 271 in Aue
PDF, 92 KByte
- Area recycling of a sewage treatment plant sludge drying facility – renovation and reuse of 6 basinsAuthors
PDF, 2480 KByte
|