Dr. Spang GmbH

Demolition of buildings, Germaniastraße 18, Essen


Developer

Germa-Grundstücks-Verwaltungsgesellschaft mbH, Essen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 684 KByte

Project

  • Demolition of several halls with offices and garages on the property at Germaniastr. 18 in Essen
  • Volume of building 6,500 m3
  • In previous years the property was used by as a site by A. Schumacher Bergbaubedarf GmbH
  • Given the age of the building and its former industrial use as a maintenance facility for mining equipment, the fabric of the building and the subsoil are expected to be polluted
  • There are also two oil separators on the land

Our services

  • Preparation of a disposal concept
  • Expert support
  • Declaration analysis
  • Analyses of the building fabric (joint/sealing and bonding material) for asbestos and PCBs will be performed alongside demolition
  • Sorting of the soil below the oil separators
   

Demolition of buildings, Wittener Straße 21 in Witten


Developer

Ing.-Büro für Architektur und Bauwesen Dipl.-Ing. C.D. Böllinghaus, Witten

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 655 KByte

Project

  • Construction of a new residential and commercial building at Wittener Straße 21 in Witten-Herbede
  • At present the property is occupied by a two-storey flatroofed building built in 1982
  • The building to be demolished is currently used as shop space for a Netto discount supermarket and a flower shop

Our services

  • Analysis of the pollution existing in the fabric of the building
  • Estimation of the costs of removing contaminated building materials
  • Risk assessment
  • Preparation of a rough demolition and redevelopment concept
  • Disposal concept for the existing building
   

Mindener Straße in Düsseldorf


Developer

Vivawest Wohnen GmbH, Gelsenkirchen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 869 KByte

Project

  • The housing development space will be made ready for construction
  • The tendering documents for the preparatory earthworks will be prepared on the basis of the excavation and reutilisation concept
  • Total area approx. 3.8 ha
  • According to development plan no. 03/2012 are total of 7 general housing zones and 1 mixed zone will be provided

Our services

  • Excavation and reutilisation concept with the necessary field analyses
  • Expert support for the excavation works
  • Engineering services for the waste classification and preparation of the tendering documents
  • Evaluation of the areas suspected of contamination in accordance with soil protection legislation
  • Georeferenced survey of the surface areas
  • Soil management concept
  • Reutilisation concept in accordance with the requirements of the City of Düsseldorf
   

Lösenbach landfill at Lüdenscheid


Developer

Abfallentsorgungsgesellschaft Lösenbach GmbH, Iserlohn

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 694 KByte

Project

  • Soil and building rubble landfill for landfill class DK I, in which large quantities of plasterboard are also dumped
  • The Lösenbach waste disposal facility is located in the grey wacke quarry on the Lösenbacher Landstraße / Zum Brauberg in Lüdenscheid
  • While mining work is continuing in the southern part of the quarry, the northern part is already being used for dumping soil and building rubble
  • A variety of stability analyses for the landfill site, which has a 1:1.5 slope in the dumping phase, is required for the landfill area
  • The total dumping capacity available in the quarry is approx. V = 6 million m³

Our services

  • Stability analyses for the landfill site
  • Laboratory tests
  • Estimation of the shear strength of plasterboard
  • Geotechnical support during construction
   

Building project B10/B14, Leuze connection, planning approval section 1.4, Stuttgart 21


Developer

City of Stuttgart, civil engineering and municipal drainage department, Stuttgart

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 683 KByte

Project

  • Construction of a 3rd tube in the Leuze tunnel in the cut-and-cover method as a water-impermeable concrete structure
  • Lengthening of all three Leuze tunnel tubes inc. merging exit from the Berger tunnel at the eastern portal of the B10/B14 by about 70 towards the east
  • Preparation of a ramp up to the König Karls bridge
  • Transition to the B14 into the city through the short Bergersprudler tunnel
  • Road adjustments will be required following completion of the project

Our services

  • Geotechnical and geological support during construction
  • Environmental support and coordination during construction
  • Analysis of contamination and sampling of debris, pit dredgings and the material obtained from bored piling works
  • Waste management
  • Declaration analysis of filling material and soils
  • Environmental requirements, landfill regulations, disposal of excavated road material
  • Examination of disposal routes and records
   

Sports pitch redevelopment on Albert Schweitzer Straße 1, Hemer


Developer

Town of Hemer, Education and Sport department

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 705 KByte

Project

  • Redevelopment of a sports pitch at Friedrich-Leopold-Woeste school in Hemer
  • Subsoil pollution
  • The existing tamped surface of the football pitch will be removed and replaced

Our services

  • Sampling in accordance with technical rules for hazardous substances
  • Chemical analyses in accordance with the LAGA guideline and environmental inspection
  • Seepage analyses
  • Supplementary chemical analyses of dioxin content and hazard assessment pursuant to soil protection and water management legislation
  • Clarification of possible disposal methods
  • Cost estimate in respect of excavation, transport and dumping of the dioxin-polluted material
  • Performance of detailed declaration analyses and examination of the adjacent areas in compliance with German soil protection legislation, including hazard assessment and environmental impact assessment
  • Planning and invitation to tender of the redevelopment measures
  • Occupational safety, health and safety officer and BGR 128 services, including site monitoring
   

Freight terminal yard


Developer

Deutsche Bahn AG

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 197 KByte

Project

  • Demolition of a total of 10 buildings
  • Preparation of the demolition works
  • Geotechnical consultancy for subsequent use as a freight terminal

Our services

  • Analyses of the structure to determine the presence of pollutants in the building fabric
  • Preparation of the demolition concept
  • Research of disposal methods
  • Specialist construction supervision
   

Redevelopment of ash landfill, Brunn, Vogtland


Developer

Geo Saxonia Dr. Darbinjan & Partner GbR, Freiberg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 663 KByte

Project

  • The old landfill crossed over a stream that is currently led in pipes through the site
  • The pipes are in poor condition, particularly in the discharge area
  • The surface of the old landfill is currently covered with mineral soils and will be used as a storage facility for rubble, excavated road material and building waste
  • Slope up to 20 m high

Our services

  • Geotechnical stability assessment
  • Stability calculations based on field investigations and soil mechanical laboratory analyses
   

Mülheim-Raffelberg filter cake landfill, gas drainage and equalizing layer and waste profiling


Developer

Ruhrverband, West Region, Essen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 289 KByte

Project

  • For the establishment of the equalizing and drainage layer of sewage sludge ash at the Raffelberg landfill, monitoring tests to evaluate and document the material properties and installation quality must be performed for the purposes of external inspection
  • Review and documentation of the product and material properties of the equalizing and drainage layer in a test field
  • Measures to establish a stable dump
  • Size of the landfill: 200,000 m2

Our services

  • Performance of the external inspection and monitoring at the Raffelberg landfill
  • Inspection of the installation materials
   

New Bahnstadt Opladen, Leverkusen-Opladen


Developer

DB Netz AG, Western Region via DB ProjektBau GmbH, Cologne

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 337 KByte

Project

  • The City of Leverkusen is planning to develop the area around Opladen railway station
  • Now waste ground, the railway land is to be developed and the former railway buildings on it are to be pulled down
  • Bundling the track sections for IC trains and freight trains together will free up the area currently used for freight trains for high-quality urban use and for construction of the Bahnallee road
  • As part of the overall “Bahnstadt Opladen” project, the relocation of freight train track 2324 will reduce the area between track 2730 for passenger traffic and track 2324 for freight trains

Our services

  • Subsoil analysis for the final design
  • Expert monitoring and foundation works consulting
  • Subsoil report for planning approval application
  • Subsoil analysis and report on bridge structures, signal sites and overhead line supports
  • Demolition and disposal concept for existing buildings
  • Declaration of all substances produced
  • Recommendation for demolition and dismantling and preparation of utilization concepts
   

Garden centre land at Ardeystraße 184 in Witten


Developer

Town of Witten, Planning Office

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 292 KByte

Project

  • The former garden centre (Gärtnerei Geldmacher) is to have a change of use
  • Demolition of existing buildings
  • Construction of new food store

Our services

  • Cursory demolition and redevelopment concept
  • Disposal concept with determination of quantities of building materials to be separated
  • Cost estimate for demolition of the building
  • Technical analyses of the building structure with regard to waste
  • Analysis of commercial development, tank facilities (heating oil) and greenhouses (pesticides) for contamination
  • Determination of methods for disposal of building structure requiring particular monitoring
  • Subsoil analysis with examination of the possibilities of rainwater seepage
  • Geotechnical analyses and report
  • Historical investigation
  • Subsoil evaluation and foundation works consulting
   

Support in recovery from mineral
oil damage, Ennepetal


Developer

Geisler GmbH, Unna

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 764 KByte

Project

  • Renewal of filling stations in Ennepetal
  • Filling station at Marktkauf, Kölner Str. 311
  • Organoleptically conspicuous soil was found in the course of replacement of the existing underground tank

Our services

  • Expert support for earthworks
  • Analysis of the soil contamination and determination of the need for action
  • Analysis of the residual pollution on the site
  • Evaluation of the necessary excavation and backfilling requirement
  • Notification to the competent soil protection authorities of Ennepetal district
  • Documentation to the above authority of the works carried out
   

Expansion of spoil dump in "Schledde" quarry, Hemer


Developer

Stricker-Weiken GmbH Co. KG, Warstein

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 834 KByte

Project

  • Stabilization of the spoil dump in the "Schledde" quarry in Hemer
  • Dump expanded by approx. 2 ha to a total surface area of 4 ha
  • Measures to establish a stable dump

Our services

  • Subsoil analyses
  • Stability investigations pursuant to DIN 4084
  • Planning and development of measures to improve the stability of the dump
  • Concept design and surveying of a settling and retention basin as a receiving and settling basin for eroded soil material
  • Laboratory tests to determine the installation criteria
  • Measures to prevent soil subsidence close to the surface and slaty erosion
   

Rote Halde landfill, Iserlohn-Letmathe


Developer

Lobbe Abfall GmbH, Iserlohn

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 887 KByte

Project

  • Sealing of a soil and buildings materials landfill site of DKI
  • Establishment of the surface seal comprising bentonite mat, drainage layer and recultivated soil
  • 54,000 m² largely with incline of 1:3, in some areas with incline 1:2; in these areas tensile forces must be absorbed and diverted by geogrids

Our services

  • Planning, quality assurance and project coordination
  • Expert technical consultancy
  • Supervision of works
  • Preparation of the tender documents, QA plan and geotechnical evidence
  • Support for self-supervision of the installer
  • Geotechnical laboratory tests
  • Concept design and planning of construction water drainage system
   

Dismantling of an engine hall

with administrative annexe in Freudenstadt


Developer

DB Services Immobilien GmbH, Karlsruhe

Dr. Spang GmbH




Project

  • Dismantling of a former engine hall with two assembly pits
  • Length 85 m, width 13 m
  • Dismantling of an administrative building
  • Length 85 m, width 6.5 m

Our services

  • Environmental inspection
  • Cursory analysis of the subsoil
  • Waste analyses of the building fabric of both structures
  • Reports for soil and building fabric
   

Solingen electronic signal box,
1st construction phase


Developer

DB AG, Western Region via DB ProjektBau GmbH, Cologne

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 161 KByte

Project

  • The area under examination is located on track section 2730, km 0.020 to 26.600 between the stations of Gruiten and Cologne- Mülheim
  • Dismantling of old and construction of new rail facilities
  • New cable run
  • Technical modifications

Our services

  • Subsoil analysis during construction
  • Expert monitoring
  • Environmental coordination
  • Foundation works consultancy
  • Sampling
  • Declaration analyses
  • Classification of building fabric for recycling
  • Preparation of recycling and disposal concepts
   

Düsselpark, Gerresheim South, Düsseldorf


Developer

City of Düsseldorf, environment agency

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 142 KByte

Project

  • Development plan 5976/025 for the former grounds of the Gerresheim glassworks
  • Area approx. 12 ha
  • Investigation programme for approx. 270 core soundings and dynamic probings in a grid of 30 m
  • Urban redevelopment concept with residential and commercial properties and a park through the exposure and configuration of the Düssel river running through it

Our services

  • Subsoil investigation and technical evaluation of the native backfills and grown soil
  • Foundation works consultancy for urban sewerage and drainage infrastructure
  • Roadbuilding measures and use as envisaged in the development plan
  • Dismantling and disposal concept for the existing industrial structures
   

ESV sports ground, Östingstraße, Hamm


Developer

Federal Office for Railway Assets, West Region, Essen office

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 161 KByte

Project

  • Preparation for the sale of a property of size approx. 20,000 m²
  • The property, which is used by ESV Hamm, is being sold by the Federal Office for Railway Assets
  • Determination of the consequential soil costs in respect of contamination and soil/waste

Our services

  • Detailed investigation of inherited liability, modules I (contaminated sites) and II (waste/soil)
  • Elaboration of analysis concepts for the individual FRIDU modules
  • Inspection planning
  • Subsoil investigation
  • Chemical analyses
  • “Risk assessment” expert report, detailed investigation level
   

Limitation of contamination following a freight train accident


Developer

DB Netz AG, Southwest Region, Stuttgart

Dr. Spang GmbH




Project

  • Freight train accident in Stuttgart-Untertürkheim (Deckerstr. / Augsburger Str.) on 15.03.2010
  • Soil contaminated by damaged tank wagon (diesel)
  • Approx. 300 - 400 l of diesel fuel escaped
  • The accident was located in the heart of the mineral spa protection zone at the edge of the Neckar floodplain

Our services

  • Risk assessment
  • Investigation to limit the extent of the damage
  • Subsoil analysis, 7 core soundings
   

Expanding the central sewage plant, Freiberg


Developer

City of Freiberg, waste water disposal services

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 281 KByte

Project

  • Subproject to clear a site in order to create a rainwater retaining basin in the Münzbach valley
  • Demolition of 7 buildings, one chimney and other paved external installations (e.g. loading ramps, roads) over a total area of approx. 1.4 ha

Our services

  • Research of historical documents regarding previous construction
  • Investigations of existing building fabric / materials for pollutants
  • Preparation of a demolition and disposal concept with determination of the quantities of building materials requiring separation
  • Determination of the disposal routes for building fabric requiring particular monitoring (e.g. asbestos, PCBs, tar cork, etc.)
  • Elaboration of the necessary documents for approvals and consents
  • Cost estimate and calculation of construction times
  • Preparation for award of contract
  • Assistance in award of contract
  • Construction supervision
   

Building project in the Grusonsstrasse, Frankfurt am Main, 2. BA


Developer

Groß & Partner Grundstücksentwicklungsgesellschaft mbH, Frankfurt am Main

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 89 KByte

Project

  • Demolition of a former station building and ancillary building between the railway cutting on the Frankfurt-East – Hanau section and the Danziger Platz
  • New construction of a 6-storey business premises
  • Area 105 x 45 m
  • Basement construction on new building depending on subsoil condition, 1 o2 2 basement levels

Our services

  • Investigation concept
  • Investigation of subsoil
  • Report on environmental engineering
  • Demolition and disposal concept
  • Recommendations for foundations and for controlling groundwater
  • Environmental engineering examination and assessment of the soil and the fabric of the building for existing pollutants
  • Assessment of subsoil and advice on foundations
   

Change of use for Kleff sewage treatment works, Witten


Developer

Ruhrverband, Essen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 260 KByte

Project

  • Change of use from sludge drying sites and basins to residential use
  • Area recycling of a sewage treatment sludge drying facility, taking account of LAGA and BBodSchV, with renovation and change of use for 6 former sludge drying basins

Our services

  • Historical investigations, initial assessment
  • Inspection of plans and elevations for mines
  • Risk assessment, investigation of renovation works
  • Site assessment with a view to planned change of use
  • Planning for renovation, encapsulating using Trisoplast sealant liner
  • Drawing up and monitoring an investigation programme
  • Support during renovation
  • Third-party monitoring of landfill construction
  • Identifying soil contaminations
  • Determining the risk potential to groundwater, soil air, soil
  • Renovation concepts
  • Planning for readying site for construction, and renovation
   

Institut für Zuverlässigkeit und Mikrointegration (IZM), Technopark Chemnitz


Developer

Fraunhofer Society, Munich

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 150 KByte

Project

  • Building a research institute for nanotechnology with increased expenditure for foundations (dampening vibrations)
  • 35 x 35 m area, 4 storeys, cellar level with connecting access to neighbouring building

Our services

  • Subsoil report with settlement calculations
  • Proof of slope failure
  • Dimensioning of water raising during the construction period
  • Authorisation under water laws
  • Demolition and disposal concept for the old buildings
  • Energy use of a deep well concept
   

Investigation of renovation works
to the former Bebbelsdorf quarry, Witten


Developer

Ennepe - Ruhr - Kreis, Schwelm

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 143 KByte

Project

  • Covering 5 sandstone faults in a ridge of hills, filled during the period 1962 to 1971 with building rubble and domestic waste, and individual faults in the rock also being filled with industrial waste from hard coal working, producing a total of approx. 100.000 m³ of infill
  • Pollutants: significant contamination with polycyclic aromatic hydrocarbons (PAH), phenols, PCBs and heavy metals, in part with significant methane gas formation
  • Discharges of pollutants via percolation water and groundwater have been demonstrated

Our services

  • Investigation of prior pollution with stages for Historical Investigation, Technical Investigation (Risk Assessment)
  • Comprehensive supplementary risk assessment for renovation
  • Subsoil investigation using 2,000 m core drillings and test drillings pursuant to DIN 4021
  • Taking samples
  • Chemical soil, groundwater and soil air analysis
  • Devising renovation proposals
   

Renovation of the waste
heap complex 271 in Aue


Developer

Saxony Land Office for the Environment and Geology

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 92 KByte

Project

  • Final design of the waste heap including associated roads, paths, waterways and landscaping construction
  • Volume totalling 13.7 million m³ and a footprint of approx. 67 ha

Our services

  • Third-party monitoring of quality-appropriate execution of renovation of the heap and bringing into reuse
  • Monitoring execution of the object for compliance with the permission on radiation protection and respecting state of the art for construction of paths, waterways and landscaping
  • Checks on re-storage and profiling works, determining the degree of grouting, the degree of grouting including permeability coefficients and particle distribution, proof of suitability of the covering layers, applying the covering layers to the embankments and parts of the plateau and extending percolation water catchments
   

Area recycling of a
sewage treatment plant sludge
drying facility – renovation and
reuse of 6 basinsAuthors

Autoren

Dipl.-Ing. Axel Sommerfeld, Essen Dipl.-Ing. Christian Spang und Dipl.-Geol. Gerhard von Zezschwitz, Witten

Dr. Spang GmbH

Expert article
Dr. Spang GmbH PDF, 2480 KByte

Fachartikel

  • The Ruhrverband, Essen, used a site of approx. 60.000 m² on the Kleff road in Witten as a sludge drying site for the Witten sewage treatment works, situated alongside the Ruhr. The 6 basins were investigated for planned reuse for residential housing between 2001 and 2005, with the result that in one infilled basin (Basin 6) very high levels of organic pollutants (EOX, BTEX, PAH) were found, together with back-fill at the bottom of the emptied Basins 1 to 5, in some places with significantly increased levels of PAH and heavy metals. Due to the total volume of over 44,000 m³ of chemically contaminated back-fill materials, the site is to be made ready for building by local restorage and securing or through removal of materials with lower pollution levels. Renovation of the site includes securing (encapsulating) the more heavily contaminated back-filling materials in Basins 5 and 6. A surface seal was created over the two basins using Trisoplast, over an area of approx. 8,000 m². The sustainability of the renovation is checked using groundwater monitoring.

    Read the full article:

    PDF, 2480 KByte


nach oben TOP

 
Dr. Spang GmbH

Company head office Witten

Phone: 02302 - 9 14 02 -0
Fax:  02302 - 9 14 02 -20
E-Mail zentrale@dr-spang.de

Esslingen/Neckar

Phone: 0711 - 351 30 49 -0
Fax:  0711 - 351 30 49 -19
E-Mail esslingen@dr-spang.de

Frankfurt am Main

Phone: 069 – 678 6508 – 0
Fax: 069 – 678 6508 – 20
E-Mail frankfurt@dr-spang.de

Freiberg/Saxony

Phone: 03731 - 79 87 89 -0
Fax:  03731 - 79 87 89 -20
E-Mail freiberg@dr-spang.de

Nuremberg

Phone: 0911 - 9 64 56 65-0
Fax:  0911 - 9 64 56 65-5
E-Mail nuernberg@dr-spang.de

Naumburg/Saale

Phone: 03445 - 762 - 25
Fax:  03445 - 762 - 20
E-Mail naumburg@dr-spang.de

Hamburg

Phone: 040 – 524 73 35-0
Fax:  040 – 524 73 35-20
E-Mail hamburg@dr-spang.de

Berlin

Phone: 0331 - 231843 - 0
Fax:  0331 - 231843 - 20
E-Mail berlin@dr-spang.de

Munich

Phone: 089-2 77 80 82-60
Fax:  089-2 77 80 82-90
E-Mail muenchen@dr-spang.de

Kufstein

Phone: +43 (0)5372 - 23200-0
Fax:  +43 (0)5372 – 23200-20
E-Mail kufstein@dr-spang.at

Download

Project descriptions

  • Demolition of buildings, Germaniastraße 18, Essen
    Dr. Spang GmbH PDF, 684 KByte
  • Demolition of buildings, Wittener Straße 21 in Witten
    Dr. Spang GmbH PDF, 655 KByte
  • Mindener Straße in Düsseldorf
    Dr. Spang GmbH PDF, 869 KByte
  • Lösenbach landfill at Lüdenscheid
    Dr. Spang GmbH PDF, 694 KByte
  • Building project B10/B14, Leuze connection, planning approval section 1.4, Stuttgart 21
    Dr. Spang GmbH PDF, 683 KByte
  • Sports pitch redevelopment on Albert Schweitzer Straße 1, Hemer
    Dr. Spang GmbH PDF, 705 KByte
  • Freight terminal yard
    Dr. Spang GmbH PDF, 197 KByte
  • Redevelopment of ash landfill, Brunn, Vogtland
    Dr. Spang GmbH PDF, 663 KByte
  • Mülheim-Raffelberg filter cake landfill, gas drainage and equalizing layer and waste profiling
    Dr. Spang GmbH PDF, 289 KByte
  • New Bahnstadt Opladen, Leverkusen-Opladen
    Dr. Spang GmbH PDF, 337 KByte
  • Garden centre land at Ardeystraße 184 in Witten
    Dr. Spang GmbH PDF, 292 KByte
  • Support in recovery from mineral oil damage, Ennepetal
    Dr. Spang GmbH PDF, 764 KByte
  • Expansion of spoil dump in "Schledde" quarry, Hemer
    Dr. Spang GmbH PDF, 834 KByte
  • Rote Halde landfill, Iserlohn-Letmathe
    Dr. Spang GmbH PDF, 887 KByte
  • Solingen electronic signal box, 1st construction phase
    Dr. Spang GmbH PDF, 161 KByte
  • Düsselpark, Gerresheim South, Düsseldorf
    Dr. Spang GmbH PDF, 142 KByte
  • ESV sports ground, Östingstraße, Hamm
    Dr. Spang GmbH PDF, 161 KByte
  • Expanding the central sewage plant, Freiberg
    Dr. Spang GmbH PDF, 281 KByte
  • Building project in the Grusonsstrasse, Frankfurt am Main, 2. BA
    Dr. Spang GmbH PDF, 89 KByte
  • Lütgendortmunder Hellweg site, Bochum
    Dr. Spang GmbH PDF, 122 KByte
  • Change of use for Kleff sewage treatment works, Witten
    Dr. Spang GmbH PDF, 260 KByte
  • Institut für Zuverlässigkeit und Mikrointegration (IZM), Technopark Chemnitz
    Dr. Spang GmbH PDF, 150 KByte
  • Investigation of renovation works to the former Bebbelsdorf quarry, Witten
    Dr. Spang GmbH PDF, 143 KByte
  • Renovation of the waste heap complex 271 in Aue
    Dr. Spang GmbH PDF, 92 KByte
  • Area recycling of a sewage treatment plant sludge drying facility – renovation and reuse of 6 basinsAuthors
    Dr. Spang GmbH PDF, 2480 KByte