Dr. Spang GmbH

B240 Weenzen-North bypass and Marienhagen bypass


Developer

Lower Saxony Regional Authority for Roadbuilding and Traffic, Hameln division

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 138 KByte

Project

  • Planning approval procedures for the approx. 3,600 m long B240 bypasses for Weenzen-North and Marienhagen
  • 3 flyovers with single and multi-span bridges
  • Cuttings up to approx. 20 m deep
  • Embankments up to approx. 6 m high
  • Bored tunnel with a length of 290 m

Our services

  • Preparation of an investigation programme
  • Preparation of project specifications and schedule of works for the invitation to tender for the field investigation
  • Research into existing contamination
  • Specialist support for investigative works
  • Surveying of outcrops
  • Geotechnical track report
  • Geotechnical tunnel report
   

Wagon loading line, Stuttgart


Developer

DB Services Immobilien GmbH

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 128 KByte

Project

  • Construction of a new underground road to serve the complete A 1 area as part of the Stuttgart 21 project
  • Total length 480 m with branch structure
  • Width up to 20 m, cut-and-cover method
  • Embankments in places, up to 8 m high
  • Immediately adjacent to existing underground train track, partially integrated into neighbouring development with up to 9 floors
  • Complex subsoil situation (dolines, several groundwater horizons), spa and mineral sources protection area

Our services

  • Research into existing outcrops
  • Preparation of the subsoil model
  • Concept design and monitoring of pile sample loads
  • Preparation of the subsoil report with recommendation on foundations
  • Support for the developer in all geotechnical and tender-related issues
  • Performance of geostatic calculations
   

Expansion of Schönbuch railway


Developer

Zweckverband Schönbuchbahn, Böblingen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 150 KByte

Project

  • Two-track upgrade over a total length of 5.3 km in 2 subsections
  • Construction of a new workshop and rail sidings
  • Widening of an existing passage
  • Construction of a new interchange station in embankment
  • Lengthening / construction of 2 new railway flyovers, construction of a new 400 m noise barrier, conversion of a halt

Our services

  • Elaboration of the investigation concept
  • Monitoring and execution of the subsoil investigation
  • Preparation of track reports and various foundation expert reports for halts, flyovers and passages
  • Analyses and inspections of existing contamination
  • Elaboration of soil mechanics report
  • Performance of soil mechanical laboratory tests
   

Renewal of 3 passages on
DB track section 4700


Developer

DB Netze, Karlsruhe

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 128 KByte

Project

  • 3 passages under a main line
  • Kuchen, Geislingen and Lonsee passages
  • Slopes and cuttings
  • Non-homogeneous subsoil situation
  • Unstable slopes

Our services

  • Elaboration of the investigation concept
  • Investigation
  • Preparation of the subsoil report with recommendation on foundations
   

New Wendlingen - Ulm section, project section 2.1, Albvorland


Developer

DB ProjektBau GmbH, Stuttgart

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 410 KByte

Project

  • 5,800 m open track section
  • 4 road flyovers and 7 railway flyovers
  • Approx. 2,000 m trough and supporting structures
  • Albvorland tunnel
  • Car park with toilet facility with Seebach flood relief structure
  • Freight train connection

Our services

  • Geotechnics and water management expert
  • Assistance in preparation of the tender documents and the bid phase
  • Geotechnical examination and evaluation of tender documents
  • Assistance in the awarding of construction works
   

Supporting walls, St. Ingbert,
on DB track section 3250


Developer

DB Netze, Karlsruhe

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 196 KByte

Project

  • Renewal of two supporting walls 20 m and 45 m long and up to approx. 2 m high in the centre of St. Ingbert

Our services

  • Investigation of the railway embankment and embankment formation
  • Determination of the thickness of the existing supporting walls by means of core drilling
  • Preparation of the subsoil report with recommendation on foundations
  • Recommendations for new construction
   

Cologne junction, upgrade south
of Gummersbacher Straße (ASG)


Developer

Deutsche Bahn AG, Duisburg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 163 KByte

Project

  • Area examined 5 km in length on DB track section 2690
  • 6 bridge structures
  • 3 overbridges
  • 1 tunnel

Our services

  • Engineering services pursuant to HOAI § 92, assessment of subsoil and foundation works consultancy
  • Invitation to tender and monitoring of the investigation works
  • Waste analyses
  • Investigation concept / drilling programme
  • Georadar analyses
  • Specialist construction supervision
  • Evaluation of soil functions pursuant to §2 BBodSchG
   

Installation of 2 lifts at Esslingen railway station


Developer

DB Station&Service AG, Karlsruhe

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 119 KByte

Project

  • Construction of 2 new lifts from the existing underpass to the platforms
  • Demolition of the existing stairs and widening relative to the tracks to include the lifts
  • Temporary retaining wall to the tracks

Our services

  • Subsoil investigation
  • Subsoil evaluation
  • Foundation works consultancy
  • Environmental hazard assessment
  • Waste analyses
   

Construction of 3 new lifts at Aalen railway station


Developer

DB Station&Service AG, Karlsruhe

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 135 KByte

Project

  • Construction of 2 new external platforms following demolition of the existing platforms
  • Construction of 3 new lifts connected to the platform underpass (previously no access to platforms)

Our services

  • Subsoil evaluation
  • Subsoil investigation
  • Foundation works consultancy
  • Prior ordnance sounding at 3 points
  • Environmental hazard assessment
  • Waste analyses
   

Heilbronn main railway station, construction of 4 new lifts


Developer

DB Station&Service AG, Karlsruhe

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 153 KByte

Project

  • Access to platforms previously via stairs
  • Access to the platforms is to be improved by the addition of 4 new lifts
  • Demolition of the existing stairs and widening relative to the tracks to include the lifts
  • Temporary retaining wall to the tracks

Our services

  • Subsoil investigation
  • Subsoil evaluation
  • Foundation works consultancy
  • Ordnance sounding at the investigation sites
  • Contaminated site analysis
   

Major project VDE 8th Nuremberg-Berlin, Nuremberg-Ebensfeld section, 3rd exploratory programme


Developer

DB ProjektBau GmbH, Nuremberg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 383 KByte

Project

  • The existing two-track DB track sections 5900 and 5100 in the Erlangen - Ebensfeld section will be expanded by two additional tracks
  • Total length of around 70 km

Our services

  • Subsoil analyses: approx. 1,900 drill and dynamic probings, 550 ballast trial pits, 100 core drillings
  • Specialist construction supervision
  • Geotechnical investigation
  • Subsoil evaluation and foundation works consultancy for track section and approx. 600 engineering structures (bridges, noise barriers, crossing structures, passages etc.)
  • Geotechnical consultancy for the planning
   

Two-lane upgrade of the B 27 at Ofterdingen


Developer

Tübingen Regional Administrative Authority

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 151 KByte

Project

  • Approx. 7 km long four-lane bypass for the village of Ofterdingen south of Tübingen with cuttings up to approx. 15 m deep and embankments up to approx. 12 m high
  • 14 embedded bridge structures with lengths up to 200 m

Our services

  • Preparation of an investigation programme including ordnance investigation
  • Preparation of a project description for drilling works compliant with contract award procedures
  • Monitoring of subsoil investigation
  • Soil and rock-mechanical laboratory tests
  • Preparation of a track expert report, foundation recommendations and preliminary estimate for the bridge structures
  • Preparation of an investigation programme for determination of existing contamination
  • Contaminated site report
   

New Erfurt-Halle - Leipzig section, VDE 8.2


Developer

Deutsche Bahn AG / INGE BÜ section lot 4, VDE 8.2

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 220 KByte

Project

  • Construction of a new two-track electrified railway section
  • New Jüdendorf -– Dörstewitz section
  • Section lot 4 runs from km 251.510 to km 272.093, i.e. length 20.583 km
  • Various crossing structures
  • The section is configured as a two-track electrified railway section for a design speed of 300 km/h

Our services

  • Ecological site management
  • Construction supervision in respect of geotechnics and environmental protection
  • Field and laboratory analyses
  • External monitoring
   

Noise reduction measures for federal railway lines


Developer

DB ProjektBau GmbH, Munich

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 155 KByte

Project

  • Active noise mitigation measures in Bavariainstated over the Böhlen-Espenhain rail section
  • In area of 11 noise barriers on track sections 5510, 5702, 5703, 5300
  • On track sections 5300, 5310, 5500, 5830, 5850 5900 and 5910
  • For Augsburg main station, Augsburg Oberhausen and Augsburg Bärenkeller stations

Our services

  • Subsoil investigation and evaluation for structures
  • Subsoil evaluation and foundation works consultancy pursuant to HOAI § 92, stages 1 - 3
  • Field analyses (dynamic probings)
  • Chemical analysis and reporting
  • Search slots with depths of 1.25 m to 2.5 m
   

Building project, Dortmund main railway station


Developer

Deutsche Bahn AG

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 142 KByte

Project

  • Conversion and expansion of urban railway installations
  • Southern track extension below the eastern basement of the station building
  • Investigation of eastern entrance building

Our services

  • Subsoil investigation and evaluation pursuant to DIN 4021 and 4022 and pursuant to DIN 18 300 and DIN 18 196
  • Analysis of archive documents
  • Analysis of strength from concrete and masonry samples
   

Münster main railway station renovation project


Developer

DB Station & Service, Berlin

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 135 KByte

Project

  • Deep foundation of the supports of the platform roofs by means of small bored piles
  • Renovation and renewal of the main passenger tunnel (south)
  • Demolition of an existing tunnel shear wall and re-erection approx. 4 m away

Our services

  • Preliminary and main subsoil analysis
  • Expert report on the cause of the damage
  • Subsoil evaluation and foundation works consultancy
  • Supplementary analysis for deep foundation, environmental analyses
  • Supplementary analysis of the foundation contact areas of the platform supports
  • Settlement calculation
   

Gateway Gardens, Frankfurt,
urban railway connection


Developer

RMV, Frankfurt / DB Projektbau GmbH, Frankfurt

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 125 KByte

Project

  • The area known as Gateway Gardens will create residential, business and hotel facilities in Frankfurt Airport City
  • Area approx. 35 ha
  • Construction of a new urban railway connection

Our services

  • Representation of the developer on site
  • Monitoring of proper execution of the core extraction / drilling work and groundwater measuring points
  • Continuous or daily monitoring of execution of the works, progress and construction schedule
  • Common measurements with the contractor
  • Assistance in official acceptance procedures on request
  • Invoice verification
   

DB track section 6207 Knappenrode-Horka, D/PL border


Developer

DB ProjektBau, Dresden / Leipzig

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 134 KByte

Project

  • Two-track upgrade, km 22.30-66.90
  • Electrification
  • Noise mitigation measures
  • Electronic construction box
  • Upgrade of 3 stations

Our services

  • Subsoil investigation
  • Subsoil evaluation pursuant to HOAI § 92
  • Foundation works consultancy pursuant to HOAI § 92
  • Contaminated site / contaminated ballast analyses
  • Drainage expert reports
  • Geotechnical consultancy
   

Building project, Rostock main railway station


Developer

Deutsche Bahn AG, Berlin

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 111 KByte

Project

  • Dismantling of 3 tracks with a total length of 1200 m
  • Construction of 6200 m of new track with 26 sets of points
  • Construction of new track drainage system
  • Creation of a rainwater retention basin
  • Civil engineering works for cables and lines
  • Approx. 33,000 m² terrain profiling

Our services

  • Load-capacity and compression tests
  • Sampling
  • Laboratory tests for suitability and quality inspections
  • Geotechnical consultancy
  • Coordination
  • Test and inspection coordination
   

Conversion of Essen main railway station


Developer

Deutsche Bahn AG

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 101 KByte

Project

  • Redesign and building repair
  • Extensive modernisation measures on the traffic and utility areas, station building and platforms
  • Rectification of structural defects on the buildings and installations in the main railway station
  • Conversion of the northern facade of the Essen station building
  • Construction of a new glass pavilion on the south side, travel centre and DB lounge

Our services

  • Subsoil evaluation and foundation works consultancy pursuant to HOAI § 92
  • Determination of the construction condition
  • Environmental investigation and evaluation of building components and subsoil
   

Road tunnel K 4346 / K 4347, Nagold-Iselshausen


Developer

Calw District Authority

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 136 KByte

Project

  • Elimination of a level crossing by means of an embankment approx. 21 m high
  • Construction of a bored tunnel
  • Approx. 760 m new road construction
  • Tunnel length approx. 70 m
  • Clear width approx. 9 m, headroom approx. 4.7 m
  • Construction of a new footpath and cycle path underpass through the embankment
  • Construction of new cuttings and embankments requiring supporting walls up to approx. 6 m in height
  • Construction with ongoing services
  • Cut-and-cover method not possible for nature conservation reasons.

Our services

  • Subsoil investigation
  • Subsoil evaluation and foundation works consultancy for tunnel, underpass, track section, supporting walls, cuttings and embankments
   

DB AG construction project in Guntershausen area


Developer

Deutsche Bahn Netz AG, North Hesse

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 167 KByte

Project

  • Construction of 6 track sections, 2 electronic signal box sites, 2 concrete distribution stations and 4 external platforms
  • Construction of a new pedestrian underpass for DB track sections 3900 and 6340
  • Length of track section 1.5 km

Our services

  • Subsoil investigation
  • Geotechnical expert reports
  • Analysis and evaluation for the soil recycling and disposal concept
  • Analyses with regard to DIN 4020 and the corresponding railway guidelines
  • Soil mechanical laboratory tests and chemical analyses
   

B 463 bypass for Albstadt-Lautlingen


Developer

Tübingen Regional Administrative Authority, building materials and soil test institute

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 103 KByte

Project

  • Construction of a new 4.4 km long bypass in the topologically challenging Schwäbisch Alb region
  • Cuttings up to 15 m deep, embankments up to approx. 10 m high
  • 11 bridge structures, including a 45 m long bridge over a railway and a valley viaduct 330 m long and 30 m high
  • The route lies in brown and white jura and passes through several geological fault zones

Our services

  • Invitation to tender for the subsoil investigation
  • Monitoring and settlement of the subsoil investigation works
  • Subsoil evaluation and foundation recommendations for the track section and the planned bridges
   

L 384 bypass for Reutlingen-Ohmenhausen


Developer

Tübingen Regional Administrative Authority, section 44

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 388 KByte

Project

  • Construction of a new 3 km long bypass
  • Cuttings up to 6 m deep
  • Embankments up to 4 m high
  • 2 road flyovers
  • One watercourse passage

Our services

  • Invitation to tender for the subsoil investigation
  • Monitoring and settlement of the subsoil investigation works
  • Subsoil evaluation and foundation recommendations for the track section and the bridge structures
   

Stuttgart 21 - inspection contract


Developer

DB ProjektBau GmbH, southwest region, Stuttgart office

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 50 KByte

Project

  • Redesign of the Stuttgart rail hub
  • Connection to the new Stuttgart-Ulm section and Stuttgart airport
  • Conversion of the current terminus station into an underground through station with 8 platforms
  • 50 km tunnel structures in the Stuttgart metropolitan area

Our services

  • Inspection of the existing expert reports on geology, hydrogeology and geotechnics for plausibility, contradictions and completeness
  • Planning approval sections
  • Project section 1.1, valley crossing with main railway station
  • Project section 1.2, Filder tunnel
  • Project section 1.3, Filder area with airport link
  • Project section 1.5, access tunnel Feuerbach / Bad Cannstatt, urban railway link
  • Project section 1.6, access tunnel Ober-/Untertürkheim, railway yard
   

Construction of the new B236n
in Dortmund


Developer

NRW Roads Service, Bochum regional office

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 109 KByte

Project

  • 920 m long section in the Dortmund urban area
  • Connection to the southern portal of the Berghofen tunnel, currently under construction

Our services

  • Expert soil assistance for the execution planning and execution
  • Field investigations
  • Chemical analyses
  • Expert opinions
  • Determination of the soil mechanical key ratios
  • Stability tests
  • On-site construction acceptance meetings
   

Black Forest Railway,
Ostelsheimer Kurve tunnel


Developer

Calw District Authority and Böblingen District Authority

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 99 KByte

Project

  • Reactivation of the Calw-Weil track section shut down 20 years ago, length approx. 23 km
  • The current loop around the Hackstberg mountain is to be shortened by an approx. 400 m long tunnel
  • Two-track cross-section with max. overburden of approx. 12 m
  • Location in nature conservation area

Our services

  • Geotechnical analysis with core drilling and soundings
  • Soil and rock-mechanical and mineralogical laboratory analyses
  • Determination of stratum and fissure orientation with bore hole scans
  • Geotechnical expert report for tunnel and cutting options
  • Preliminary tunnel engineering expert report with initial geological, hydrogeological and tunnel engineering evaluation
  • Planning services for the tunnel pursuant to HOAI, § 55 (1), stage
   

Leipzig - Dresden upgrade, Dresden- Neustadt/Dresden main station section


Developer

DB ProjektBau GmbH, southeast region, Dresden office

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 162 KByte

Project

  • Upgrade of existing track in Dresden urban area
  • 28 bridges, 16 supporting structures, 3 track sections
  • Replacement of superstructures, removal of supports with maintenance of abutments
  • Widening of embankment bottoming with heightening of supporting structures
  • Track conversion for new track layout with services ongoing

Our services

  • Preparation of an analysis programme to determine the condition of the structure material
  • Planning and monitoring of subsoil investigation
  • Analysis of the investigation results
  • Analysis of existing contamination and hazard assessment
  • Subsequent investigation for deep foundations
  • Consultancy and construction monitoring during execution of the works
  • Determination of the renovation requirements and renovation capability of the structures
  • Planning and construction supervision for masonry injections to be carried out in order to increase the compression resistance of the abutments
   

Relaying the Böhlen – Espenhain section


Developer

DB ProjektBau GmbH, Leipzig

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 107 KByte

Project

  • As part of constructing the BAB A 72 Chemnitz-Leipzig (Rötha-A38), a crossing is being instated over the Böhlen-Espenhain rail section
  • The BAB A72 is being directed into a cutting in the area of the crossing
  • The rail route is being relocated to the north using a EÜ to be newly-created

Our services

  • Investigations of the subsoil
  • Recommendations on foundations
  • Investigations for areas subject to earlier pollution
   

DB route Leipzig - Dresden, Weinböhla – Az section


Developer

DB ProjektBau GmbH, South-East Regional Area, Dresden

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 128 KByte

Project

  • Redevelopment with full closure
  • ABS Leipzig—Dresden route, km 12,238 DE (EÜ Route), as far as km 17,617 (EÜ Sachsenstrasse)
  • Rail route upgrade to 160 km/h

Our services

  • Überarbeitung der vorliegenden Baugrundgutachten nach aktuellem Regelwerk
  • Überarbeitung der Standsicherheitsnachweise nach dem Teilsicherheitskonzept
  • Groundwatermonitoring
  • Altschotteruntersuchungen
  • hydrologische Formal record of evidence
   

Expansion section Berlin – Dresden, redevelopment with full closure


Developer

DB ProjektBau GmbH, South-East Regional Area, Dresden

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 1.502 KByte

Project

  • Redevelopment with full closure of DB section ABS BD km 31,200 to 33,209
  • Renovation of bridge constructions equipped with steel superstructures, EÜ Röderflutgraben and EÜ Röder

Our services

  • Investigation of existing construction and railway cuttings
  • Recording geotechnical conditions of cuttings and of the cutting footprint
  • Geotechnical report
  • Investigation programme pursuant to DIN 4020
  • Report on previous pollutions for handling old ballast
   

Expansion section Leipzig-Dresden / Riesa-Radebeul-West,
BA 13.04


Developer

DB ProjektBau GmbH, Projektzentrum, Dresden

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 834 KByte

Project

  • Assessment of current safety of slopes in the area of the Zeithain gravel works for slopes of loose stone up to 50 m in height
  • Length approx. 350 m with directly adjoining rail operations

Our services

  • Preparing the proofs of current stability
  • Planning investigative drillings
  • Supporting investigation works
  • Supporting investigation works
  • Devising renovation proposals
   

New construction section Rhine/Main - Rhine/Neckar


Developer

DB ProjektBau GmbH, Frankfurt

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 143 KByte

Project

  • Connecting Darmstadt and FfM-Stadion to Zeppelindamm station
  • New construction section with total length of approx. 17 km

Our services

  • Expert report services for geotechnics, tunnel construction and environmental engineering
  • Investigation of subsoil and assessment for construction works
  • Determination of geotechnical and environmental engineering basis, and lab tests
  • Devising the investigation programme
  • Examination for unexploded ordnance
  • Tendering and assistance in award of contract for investigation works
  • •Monitoring of construction for drilling and investigation works
  • Historical investigation
   

NMS Nordmainische
S-Bahn Rhine/Main


Developer

Deutsche Bahn AG, Frankfurt

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 169 KByte

Project

  • Building a 2-track S-Bahn section from FfM Konstablerwache via FfM Fechenheim, Maintal to Hanau Hbf, over a total length of 19.535 km
  • Approx. 2.0 km of the section runs in two tunnels to be worked systematically

Our services

  • Tunnel construction engineering report
  • Tendering for and monitoring of investigative works
  • One S-Bahn station is being constructed as an underground station, with 5 more as overground S-Bahn stations
  • Engineering services pursuant to HOAI § 92 Assessment of subsoil and advice on foundations
   

S7 expressway, Poland


Developer

Generalna Dyrekcja Dróg Krajowych, Autostrad Oddzial w Krakowie

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 105 KByte

Project

  • New construction element in the Lubien-Rabka Zdroj section in the Carpathian mountains/uplands
  • Approx. 17 km long, 6 lanes
  • 4 large multiple-section bridges, up to approx. 500 m in length
  • 9 overpasses, 21 cuttings up to 20 m deep
  • 25 dams, up to 14 m above site level
  • Difficult geology with flysch sediments
  • 1980 m tunnel in the solid rock of the Rayon Maly Lubon

Our services

  • Devising the investigation programme
  • Obtaining permissions for access and to carry out works
  • Examination of the subsoil
  • Monitoring of investigative works
  • Geological engineering and hydrogeological mapping
  • Engineering and geological report
  • Tunnel construction engineering report
  • Report on hydrogeology
   

Heidebahn, 3rd construction
section Soltau - Buchholz


Developer

Landesnahverkehrsgesellschaft Niedersachsen mbH, LNVG, Hannover

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 109 KByte

Project

  • The Heidebahn is being upgraded between Soltau and Buchholz i.d.N. (km 87,967 to km 133,271) with the section currently driven at v = 80 km/h (approx. 45 km) being upgraded to v = 120 km/h

Our services

  • Geotechnical investigations of current stock
  • Devising an investigation programme
  • Assessment of subsoil and geotechnical advice pursuant to HOAI § 92
  • LAGA declaration on existing ballast
  • Services for core drillings, pressure soundings, small pile-driven boreholes and samples extracted by driving, together with the associated soil mechanical and environmental engineering investigations
   

POS North Paris-Eastern
France-South Germany -Neustadt/Weinstraße-Böhl/Iggelheim section


Developer

DB ProjektBau GmbH, Frankfurt

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 124 KByte

Project

  • Upgrade to an existing section on the DB line from Homburg (Saar) - Ludwigshafen to Ve = 200 km/h
  • Section length 11.23 km

Our services

  • Geotechnical investigations
  • Field tests, soil mechanical and chemical investigations
  • Exploratory works, small pile-driven boreholes and percolation tests
  • Evaluation and assessment of investigations and lab results
  • BoVeK outline and detailed concept
  • Planning old ballast reuse pursuant to RIL 880.4010
  • HOAI § 92, LPh 1-3
   

Bringing the Württemberg Schwarzwaldbahn back into use


Developer

Landratsamt Calw und Landratsamt Böblingen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 153 KByte

Project

  • Investigations into bring a rail line approx. 23 km long back into use, after being closed down for 30 years
  • New construction of a tunnel approx. 440 m long, renovation of two existing tunnels of 696 m and 554 m
  • Cuttings up to 36 m deep, embankments up to 64 m high
  • Investigation of 6 similarly-designed rail crossings for crossing-free solutions

Our services

  • Geotechnical investigation services for the cuttings, embankments and rock walls and for the supporting construction works to be replaced on the route
  • Test of materials in the brickwork of the existing tunnels
  • Proof of safe status for embankments and cuttings
  • Instruction on possibly necessary safety measures
  • Geotechnical evidence for the new constructions
  • Report on rock securing / protection against falling stone, with instruction of clearance or securing measures possibly necessary
   

Schönbuchbahn between
Böblingen and Dettenhausen


Developer

Zweckverband Schönbuchbahn, Böblingen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 202 KByte

Project

  • Upgrading a 17 km rail section for reuse in passenger transport
  • Removal of slow speed sections due to unstable earth banks, areas of sludge and ballast sacks
  • Renewal of structural engineering on the route

Our services

  • Georadar investigation
  • Examination for unexploded ordnance through use of historical aerial photos
  • Examination of the subsoil
  • Investigations for areas subject to earlier pollution
  • Assessment of subsoil and advice on foundations for structural engineering
  • Advice on renovation for the route

nach oben TOP

 
Dr. Spang GmbH

Witten

Phone: + 49 (0)2302 - 9 14 02 -0
Fax:  + 49 (0)2302 - 9 14 02 -20
E-Mail zentrale@dr-spang.de

Esslingen/Neckar

Phone: + 49 (0)711 - 351 30 49 -0
Fax:  + 49 (0)711 - 351 30 49 -19
E-Mail esslingen@dr-spang.de

Freiberg/Saxony

Phone: + 49 (0)3731 - 79 87 89 -0
Fax:  + 49 (0)3731 - 79 87 89 -20
E-Mail freiberg@dr-spang.de

Nuremberg

Phone: + 49 (0)911 - 9 64 56 65-0
Fax:  + 49 (0)911 - 9 64 56 65-5
E-Mail nuernberg@dr-spang.de

Naumburg/Saale

Phone: + 49 (0)3445 - 76 21 53
Fax:  + 49 (0)3445 - 76 21 62
E-Mail naumburg@dr-spang.de

Download

Project descriptions