Formal recording of evidence

Selected reference projects

Dr. Spang GmbH

New hall building at
Salinger Feld, Witten


Developer

Witt Gasetechnik AG, Witten

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 153KByte

Project

  • Construction of a new hall without basement on a surface foundation
  • Dimensions approx. 48 m x 26 m
  • Construction of new covered area between the new and the existing hall
  • Construction of new open area of approx. 2,500 m² (accesses, parking spaces)

Our services

  • Performance of vibration measurements on land adjacent to the excavation
  • Continuous measurement for a period of 4 weeks pursuant to the requirements of DIN 4150-3
  • Consulting support for the construction
  • Compaction checks
   

New diocesan archive building, Rottenburg


Developer

Episcopal Ordinariate, Rottenburg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 138 KByte

Project

  • Construction of a new administration building and underground archive of the diocese of Rottenburg
  • Prior demolition of existing buildings
  • Some of the new structures were next to buildings that did not belong to the church
  • Construction of new open area of approx. 2,500 m² (accesses, parking spaces)

Our services

  • Gathering evidence for several residential dwellings, office and administration building, historic cellar and ceiling paintings and traffic areas
  • Gathering evidence for neighbouring developments to defend against unjustified claims
   

Sparkasse Nuremberg, general renovation of building D


Developer

Sparkasse Nuremberg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 119 KByte

Project

  • Partial demolition and new construction of the above-ground part of an office and business block in an inner-city location
  • Footprint approx. 1,680 m²
  • 5 upper floors, 3 basement floors
  • Prior renovation and partial demolition of the 3 underground floors

Our services

  • Gathering evidence for neighbouring developments (business and residential blocks and traffic areas)
  • Visual inspection for evidence purposes before start of construction
  • Vibration measurements
  • Surveying and monitoring during execution of the works
   

Cleanup of contaminated former Baumann site


Developer

Amberg municipal civil engineering department

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 125 KByte

Project

  • Clean-up of a contaminated site involving replacement of contaminated soil up to 11 m below the surface of the site
  • Because of ongoing civil engineering works, evidence is gathered for the medical centre northeast of the site
  • Vibrations caused by heavy construction machinery (rollers, diggers) can cause damage to buildings

Our services

  • Performance of vibration measurements for buildings adjacent to the site
  • Continuous measurement for a period of 4 weeks pursuant to the requirements of DIN 4150-3
  • Evaluation and interpretation of the measuring data
   

New construction of Ilvesheim cycle path


Developer

Karlsruhe Regional Council, Buildings Dept 47.1 North, Heidelberg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 93 KByte

Project

  • New construction of footpath and cycle path approx. 880 m long on the Seckenheimer Strasse in Ilvesheim
  • Additional renovation of the road surface, the road drainage and the accesses to private properties along the road

Our services

  • Gathering evidence of the neighbouring construction
  • Around 40 residential dwellings were affected, with up to 4 storeys and outbuildings
  • Gathering evidence to defend against unauthorised claims
   

Phoenixbau, Stuttgart


Developer

POENIX KÖ 5 GmbH, Landesbank Baden-Württemberg, St. Eberhard Catholic Church

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 157 KByte

Project

  • Demolition of an existing 8-storey building on the Königstrasse
  • New construction of an office and business premises
  • Area of approx. 60 m x 65 m
  • 3 basement storeys
  • Foundation ditch using cast-in-situ injected concrete pile construction

Our services

  • Gathering evidence of neighbouring construction including vibration measurements, including buildings for the Landesbank Baden-Württemberg, Bundesbank, St. Eberhard cathedral church, Württembergischer Kunstverein (art foundation), tram tunnel, transport areas, residential housing and commercial premises
  • Visual gathering of evidence before start of construction
  • Measurements of vibrations and monitoring using survey engineering during execution of construction
   

Securing the Ladenburg
branch canal


Developer

Heidelberg Waterways and Shipping Office

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 81 KByte

Project

  • Securing the banks along the Ladenburg branch canal (part of the Federal waterways system)
  • Installation of sheet piling on both sides over approx. 3.5 m
  • The section being developed is lined by industrial sites, residential and commercial properties and leisure facilities

Our services

  • Gathering evidence of the neighbouring construction
  • Photographing buildings on both sides of the canal up to a distance of 60 m from the piling work
  • A total of 150 buildings and industrial sites, and also pipe bridges, culverts, sewage treatment works
  • Local photographs scheduled to the progress of construction, over a construction period of approx. 2 years
  • Report on fresh damage that came about during the construction measure
  • Determining the cause of the damage
  • Proposal for renovation, with cost estimate
   

New construction of Königsbau Passages on the Schlossplatz in Stuttgart


Developer

Garbe Bau-Technik GmbH, Hamburg, und HSH Nordbank AG, Hamburg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 191 KByte

Project

  • Demolition of the old post office building on the Schlossplatz in Stuttgart
  • New construction of a stilwerk department store with multi-level underground parking
  • Foundation ditch up to 12 m in depth; construction of foundation ditch using drill-foundation pile wall; directly adjoining, partly historic buildings

Our services

  • Gathering evidence of neighbouring construction in advance of the new construction measure, to guard against unauthorised claims
  • Several intermediate site inspections due to reports of damage by neighbours
  • Surrounding overground buildings, including office and business premises, theatres and cinemas, Königsbau and residential housing, including outdoor areas; built area approx. 41,000 m²
  • Gathering evidence on tunnel pipes for the B 27 (road) and S-Bahn railway
  • Gathering evidence in relation to transport areas
  • Gathering evidence in relation to the passable cable tunnels
   

X-House- und Gutenberg-Höfe, Heidelberg


Developer

HOCHTIEF Projektentwicklung GmbH, Heidelberg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 174 KByte

Project

  • New construction of land in Heidelberg formerly used by HDM
  • Part of the existing construction directly adjoins the new building, making underpinning necessary

Our services

  • Gathering evidence of neighbouring buildings (approx. 37,000 m²) and transport areas before the planned new construction
  • Documentation accompanying construction, with recording of damage
  • Clarifying the causes of damage
  • Determining the costs of renovation
   

Window´s, residential and
commercial premises, Stuttgart


Developer

POENIX TH 5 GmbH, Stuttgart

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 135 KByte

Project

  • New construction of an office and business premises
  • Area of approx. 50 m x 30 m
  • Prior demolition of 5 upper storeys in the existing building
  • New construction built onto the remaining 3 lower storeys of the old building

Our services

  • Gathering evidence of neighbouring buildings, including an 11-storey tower and buildings for the Deutsche Bank and the Landesbank Baden-Württemberg
  • Visual gathering of evidence before start of construction
  • Vibration measurements
  • Monitoring using survey engineering during execution of construction

nach oben TOP

 
Dr. Spang GmbH

Witten

Phone: + 49 (0)2302 - 9 14 02 -0
Fax:  + 49 (0)2302 - 9 14 02 -20
E-Mail zentrale@dr-spang.de

Esslingen/Neckar

Phone: + 49 (0)711 - 351 30 49 -0
Fax:  + 49 (0)711 - 351 30 49 -19
E-Mail esslingen@dr-spang.de

Freiberg/Saxony

Phone: + 49 (0)3731 - 79 87 89 -0
Fax:  + 49 (0)3731 - 79 87 89 -20
E-Mail freiberg@dr-spang.de

Nuremberg

Phone: + 49 (0)911 - 9 64 56 65-0
Fax:  + 49 (0)911 - 9 64 56 65-5
E-Mail nuernberg@dr-spang.de

Naumburg/Saale

Phone: + 49 (0)3445 - 76 21 53
Fax:  + 49 (0)3445 - 76 21 62
E-Mail naumburg@dr-spang.de

Download

Project descriptions