New hall building at
Salinger Feld, Witten
Developer
Witt Gasetechnik AG, Witten

Download the project description
PDF, 153KByte
|
Project
- Construction of a new hall without basement on a surface foundation
- Dimensions approx. 48 m x 26 m
- Construction of new covered area between the new and the existing hall
- Construction of new open area of approx. 2,500 m² (accesses, parking spaces)
Our services
- Performance of vibration measurements on land adjacent to the excavation
- Continuous measurement for a period of 4 weeks pursuant to the requirements of DIN 4150-3
- Consulting support for the construction
- Compaction checks
|
| |
|
New diocesan archive building, Rottenburg
Developer
Episcopal Ordinariate, Rottenburg

Download the project description
PDF, 138 KByte
|
Project
- Construction of a new administration building and underground archive of the diocese of Rottenburg
- Prior demolition of existing buildings
- Some of the new structures were next to buildings that did not belong to the church
- Construction of new open area of approx. 2,500 m² (accesses, parking spaces)
Our services
- Gathering evidence for several residential dwellings, office and administration building, historic cellar and ceiling paintings and traffic areas
- Gathering evidence for neighbouring developments to defend against unjustified claims
|
| |
|
Sparkasse Nuremberg, general renovation of building D
Developer
Sparkasse Nuremberg

Download the project description
PDF, 119 KByte
|
Project
- Partial demolition and new construction of the above-ground part of an office and business block in an inner-city location
- Footprint approx. 1,680 m²
- 5 upper floors, 3 basement floors
- Prior renovation and partial demolition of the 3 underground floors
Our services
- Gathering evidence for neighbouring developments (business and residential blocks and traffic areas)
- Visual inspection for evidence purposes before start of construction
- Vibration measurements
- Surveying and monitoring during execution of the works
|
| |
|
Cleanup of contaminated former Baumann site
Developer
Amberg municipal civil engineering department

Download the project description
PDF, 125 KByte
|
Project
- Clean-up of a contaminated site involving replacement of contaminated soil up to 11 m below the surface of the site
- Because of ongoing civil engineering works, evidence is gathered for the medical centre northeast of the site
- Vibrations caused by heavy construction machinery (rollers, diggers) can cause damage to buildings
Our services
- Performance of vibration measurements for buildings adjacent to the site
- Continuous measurement for a period of 4 weeks pursuant to the requirements of DIN 4150-3
- Evaluation and interpretation of the measuring data
|
| |
|
New construction of Ilvesheim cycle path
Developer
Karlsruhe Regional Council, Buildings Dept 47.1 North, Heidelberg

Download the project description
PDF, 93 KByte
|
Project
- New construction of footpath and cycle path approx. 880 m long on the Seckenheimer Strasse in Ilvesheim
- Additional renovation of the road surface, the road drainage and the accesses to private properties along the road
Our services
- Gathering evidence of the neighbouring construction
- Around 40 residential dwellings were affected, with up to 4 storeys and outbuildings
- Gathering evidence to defend against unauthorised claims
|
| |
|
Phoenixbau, Stuttgart
Developer
POENIX KÖ 5 GmbH, Landesbank Baden-Württemberg, St. Eberhard Catholic Church

Download the project description
PDF, 157 KByte
|
Project
- Demolition of an existing 8-storey building on the Königstrasse
- New construction of an office and business premises
- Area of approx. 60 m x 65 m
- 3 basement storeys
- Foundation ditch using cast-in-situ injected concrete pile construction
Our services
- Gathering evidence of neighbouring construction including vibration measurements, including buildings for the Landesbank Baden-Württemberg, Bundesbank, St. Eberhard cathedral church, Württembergischer Kunstverein (art foundation), tram tunnel, transport areas, residential housing and commercial premises
- Visual gathering of evidence before start of construction
- Measurements of vibrations and monitoring using survey engineering during execution of construction
|
| |
|
Securing the Ladenburg
branch canal
Developer
Heidelberg Waterways and Shipping Office
Download the project description
PDF, 81 KByte
|
Project
- Securing the banks along the Ladenburg branch canal (part of the Federal waterways system)
- Installation of sheet piling on both sides over approx. 3.5 m
- The section being developed is lined by industrial sites, residential and commercial properties and leisure facilities
Our services
- Gathering evidence of the neighbouring construction
- Photographing buildings on both sides of the canal up to a distance of 60 m from the piling work
- A total of 150 buildings and industrial sites, and also pipe bridges, culverts, sewage treatment works
- Local photographs scheduled to the progress of construction, over a construction period of approx. 2 years
- Report on fresh damage that came about during the construction measure
- Determining the cause of the damage
- Proposal for renovation, with cost estimate
|
| |
|
New construction of Königsbau Passages on the Schlossplatz in Stuttgart
Developer
Garbe Bau-Technik GmbH, Hamburg, und HSH Nordbank AG, Hamburg
Download the project description
PDF, 191 KByte
|
Project
- Demolition of the old post office building on the Schlossplatz in Stuttgart
- New construction of a stilwerk department store with multi-level underground parking
- Foundation ditch up to 12 m in depth; construction of foundation ditch using drill-foundation pile wall; directly adjoining, partly historic buildings
Our services
- Gathering evidence of neighbouring construction in advance of the new construction measure, to guard against unauthorised claims
- Several intermediate site inspections due to reports of damage by neighbours
- Surrounding overground buildings, including office and business premises, theatres and cinemas, Königsbau and residential housing, including outdoor areas; built area approx. 41,000 m²
- Gathering evidence on tunnel pipes for the B 27 (road) and S-Bahn railway
- Gathering evidence in relation to transport areas
- Gathering evidence in relation to the passable cable tunnels
|
| |
|
X-House- und Gutenberg-Höfe, Heidelberg
Developer
HOCHTIEF Projektentwicklung GmbH, Heidelberg
Download the project description
PDF, 174 KByte
|
Project
- New construction of land in Heidelberg formerly used by HDM
- Part of the existing construction directly adjoins the new building, making underpinning necessary
Our services
- Gathering evidence of neighbouring buildings (approx. 37,000 m²) and transport areas before the planned new construction
- Documentation accompanying construction, with recording of damage
- Clarifying the causes of damage
- Determining the costs of renovation
|
| |
|
Window´s, residential and
commercial premises, Stuttgart
Developer
POENIX TH 5 GmbH, Stuttgart

Download the project description
PDF, 135 KByte
|
Project
- New construction of an office and business premises
- Area of approx. 50 m x 30 m
- Prior demolition of 5 upper storeys in the existing building
- New construction built onto the remaining 3 lower storeys of the old building
Our services
- Gathering evidence of neighbouring buildings, including an 11-storey tower and buildings for the Deutsche Bank and the Landesbank Baden-Württemberg
- Visual gathering of evidence before start of construction
- Vibration measurements
- Monitoring using survey engineering during execution of construction
|
TOP
|
|