Construction of new
industrial hall in Bönen


Developer

PBC BauConsult GmbH, Castrop-Rauxel

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 813 KByte

Project

  • Construction of a new hall without basement in the industrial area between A 2 motorway and Niederhofer Weg in Bönen
  • Surface area 100 m x 100 m
  • Extensive earthworks and backfilling
  • Soil improvement with vibro replacement columns

Our services

  • Subsoil analyses pursuant to DIN 4021 for building (without basement) and open areas for HGV traffic (inc. soil mechanical laboratory tests)
  • Analysis of the native groundwater for concrete aggressiveness
  • Foundation expert report for building structure and base pursuant to DIN 4020
  • Foundation recommendations for road construction and the traffic areas
  • Water gauge construction
  • Construction support inc. compaction checks
   

Conversion of Centrum Galerie Dresden


Developer

Corio Veste GmbH, Dresden

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 721 KByte

Project

  • Conversion of the multifunctional shopping centre located in Dresden city centre
  • Restructuring of the rental areas from the basement to the 2nd floor
  • Creation of new commercial areas
  • The shopping centre has a gross surface area of approx. 105,000 m2 and approx. 880 parking spaces
  • The project affects approx. 19,500 m², with conversion taking place while the centre continues in operation
  • Existing foundation underpinned by high-pressure injection

Our services

  • Technical planning of the subsoil/foundation for retrospective foundation laying
  • Subsoil investigation
  • Existing foundation underpinned by high-pressure injection
  • Retrospective foundation laying for extended load distribution
  • Water rights application
  • Project and structural engineering planning (performance phases 2-4) for the retrospective foundation laying
  • Geotechnical support during construction
   

PPP Antoniuskolleg school, Neunkirchen-Seelscheid


Developer

GOLDBECK Public Partner GmbH, Bielefeld

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 922 KByte

Project

  • Renovation and partial construction of Antoniuskolleg school
  • The site for the newbuild is on Pfarrer-Schaaf-Straße
  • Dimensions approx. 70 m x 30 m
  • The newbuild has no basement, is 3 to 4 storeys high and connects the historic old building with Franz-von-Sales house

Our services

  • Subsoil analysis
  • Subsoil expert report and foundation work consultancy
  • Geotechnical support during construction
   

Socially Integrative City –
Rheydt city centre concept


Developer

City of Mönchengladbach, Rheydt town hall

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 715 KByte

Project

  • Implementation of the city centre concept in areas including Marktplatz Rheydt, Marienplatz, Bahnhofstr. / Langensgasse and Sparkassenvorplatz
  • Redesign of vehicular and pedestrian areas
  • Redesign of waiting and rest zones
  • Conversion of an underground car park and its road and pedestrian accesses

Our services

  • Subsoil analysis and assessment
  • Classification of road bed materials and excavated soil in respect of recycling capability
  • Classification of asphalt surface material pursuant to RuVA-StB
  • Examination of the seepage capability of native soils
  • Determination of groundwater levels
  • Foundation works consultancy
  • Expert support for construction works
   

Construction of new residential blocks in the university quarter
in Essen


Developer

Evonik Wohnen GmbH, Duisburg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 114 KByte

Project

  • Erection of approx. 90 residential units in 4 and 5-storey multifamily dwellings with underground garage
  • Reallocation of use of the land of size approx. 7,500 m² as part of the “Greening the centre of Essen – university quarter” project
  • Location: on the current wasteland between Friedrich Ebert Straße in Essen and the university on parts of the former Essen-North goods station

Our services

  • Specialist advice
  • Inspection of archive documents
  • Subsoil investigation
  • Orientational chemical analyses
  • Foundation works consultancy
   

Enlargement of district offices, Heidenheim


Developer

Heidenheim District Authority

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 152 KByte

Project

  • Annexe has a footprint of approx. 70 m x 15 m
  • Basement, ground floor, 2 upper floors
  • Parking spaces
  • Location in a water protection area
  • Heavily karstified mountains
  • Very non-homogeneous subsoil conditions

Our services

  • Elaboration of the investigation concept
  • Subsoil investigation
  • Foundation expert report
  • Monitoring of subsoil investigation
   

MGL Hamm, expansion
of logistics warehouse


Developer

Dipl.-Ing. Gerhard Klaffenbach BDB, planners and project managers, Dillenburg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 138 KByte

Project

  • Enlargement of logistics warehouse on Hafenstraße 119
  • Construction of three new industrial halls without basements
  • Total footprint approx. 30,000 m²
  • Construction of a new office building
  • Footprint approx. 310 m²
  • Development of open space
  • Construction of a new noise protection wall

Our services

  • Subsoil investigation pursuant to DIN 4021
  • Foundation expert report for building structure and base pursuant to DIN 4020
  • Examination of the recyclability of excavated materials
  • Constructional information for road engineering
  • Geotechnical support during construction
   

Hamm logistics centre, building damage


Developer

MGL METRO Group Logistics, Warehousing GmbH & Co. KG, Sarstedt

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 129 KByte

Project

  • Following erection of the service and logistics centre for food on Hafenstraße 119, the building suffered constant damage
  • Both lifting and subsidence have occurred
  • Footprint approx. 310 m²

Our services

  • File research
  • Examination of the damage to the building
  • Inspection of mine plans and elevations
  • Evaluation of possible safety and renovation measures
  • Elaboration of further investigative plans
   

Construction of new factory building for the Strohgäu railway
in Korntal


Developer

Zweckverband Strohgäubahn, Ludwigsburg

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 127 KByte

Project

  • Servicing hall as steel structure with a 10t gantry crane, span 14.0 m (footprint approx. 39.75 m x 16.0 m)
  • Also three-storey function annexe (footprint approx. 35.0 m x 9.0 m), with assembly pit, but without basement
  • External cleaning facility with housing; external store
  • Filling station and refilling facility
  • Dismantling and conversion of track system of length approx. 175 m

Our services

  • Research into existing outcrops
  • Preparation of the subsoil model
  • Concept design and monitoring of pile sample loads
  • Preparation of the subsoil report
  • Support for the developer in all geotechnical and tender-related issues
  • Performance of geostatic calculations
   

Düsselpark in Gerresheim South, Düsseldorf


Developer

Düsseldorf Environmental Office

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 207 KByte

Project

  • Renaturation and development of the former industrial area of the Gerresheim glassworks
  • Area approx. 12 ha
  • Urban redevelopment concept with residential and commercial properties and a park (Düssel Park) through the exposure and configuration of the Düssel river running through it

Our services

  • Subsoil investigation and technical evaluation of the native backfills and grown soil
  • Foundation works consultancy for urban sewerage and drainage infrastructure, road engineering measures and use consistent with a development plan
  • Dismantling and disposal concept for the existing industrial structures
   

Bergeshövede lock-keeper’s building


Developer

NRW construction and property management, Münster office

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 172 KByte

Project

  • New building with a footprint of approx. 18 x 20 m
  • Due to the terrain, the building is to be erected as a 2-storey structure on the south side, a 1-storey structure on the north side

Our services

  • Subsoil investigation pursuant to DIN 4020
  • Investigation of strata sequence and compactness of the ground
  • Determination of aggregate gradation, volatile solids and lime content
   

Commercial premises with underground car parking, Grusonsstrasse, Frankfurt am Main


Developer

Groß & Partner Grundstücks-entwicklungsgesellschaft mbH, Frankfurt am Main

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 777 KByte

Project

  • Constructing an office building with approx. 2,500 m² floor space, 6 office levels and two underground car park levels
  • Demolition of an overhead hopper prior to the actual construction measure, located close to the railway embankment and near an S-Bahn tunnel

Our services

  • Investigation of subsoil
  • Report on foundations
  • Report on environmental engineering
  • Calculation of lifting to demonstrate feasibility of demolishing the existing construction
  • Determining the safe status of the railway embankment slope including the supporting wall
   

Stuttgart 21 investment development


Developer

DB Services Immobilien GmbH

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 101 KByte

Project

  • New construction of offices in the released station surrounds to Stuttgart 21
  • Taking into account a planned S-Bahn tunnel under the buildings
  • Inner zone of the mineral sources protection area
  • Construction area 1: Approx. 85 x 180 m, 10-storey construction
  • Construction area 2: Approx. 40 x 65 m, 20-storey tower

Our services

  • Subsoil model based on archive documents
  • Advice on foundations for spread foundations and deep foundations, and special measures for S-Bahn tunnel
  • Cost estimate for deep foundations and special measures for construction above S-Bahn tunnel
   

Landesgartenschau Hemer


Developer

Landesgartenschau Hemer 2010 GmbH

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 123 KByte

Project

  • Conversion and new construction works for the Hamer Land Garden Exhibition 2010 on the site of the former Blücher Barracks
  • New construction of a multi-purpose hall

Our services

  • Investigation and assessment of the subsoil, advice on foundations
  • Soil mechanics lab tests
  • Devising recommendations on foundations for towers, structural engineering and other constructions
  • Investigation for previously polluted areas and investigations for pipes, cables, other media and subterranean construction works
  • Risk assessments, chemical investigations
   

New construction of residential properties in Essen-Altenessen


Developer

Evonik Wohnen GmbH, Dortmund

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 169 KByte

Project

  • Barrier-free multi-generational living project in Bausemshorst / Wolbeckstrasse
  • Demolition of previous construction

Our services

  • Investigation of subsoil
  • Report on foundations
  • Percolation report
  • LAGA analyses
  • Advice during construction of geotechnical issues
   

Weissach development centre, new construction, Building 53


Developer

Dr.-Ing. h.c. F. Porsche AG, Stuttgart

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 123 KByte

Project

  • New construction of a 4-storey office building for the Weissach development centre
  • Sloping site
  • Building area approx. 81 m x 37 m
  • Connecting bridge to neighbouring building

Our services

  • Investigation and assessment of the subsoil, advice on foundations
  • Geotechnical support for earthworks
  • Acceptance of foundation bases
   

Local authority sewage treatment works, new construction, conversion of foul tanks 1 + 2, Mönchengladbach


Developer

Niersverband Viersen

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 121 KByte

Project

  • Partial demolition of existing tanks
  • Installing new foul tanks in prestressed concrete with height approx. 35 m and capacity per tank of 9,360 m³
  • Enlarged size of the foul tanks means that existing foundations need to support greater loads
  • Eccentric load

Our services

  • Investigation and assessment of subsoil
  • Geostatics evidence
  • Calculation of soil settlement, taking account of the interaction between the two foul towers and the neighbouring machine house using FEM
  • Advice on foundations, devising foundation options
  • Pre-dimensioning partial HDI underpinning
  • Settlement calculation to examine feasibility of section-wise HDI underpinning, to accommodate eccentric loads
  • Support during tendering and award of contract
  • Expert geotechnical construction management
   

New library construction, Bibliothek des 21. Jahrhunderts, Stuttgart


Developer

Stuttgart City Authorities, Overground Civil Engineering Dept.

Dr. Spang GmbH


Download the project description
Dr. Spang GmbH PDF, 193 KByte

Project

  • New construction of a library in the Stuttgart basin, on the Stuttgart 21 site
  • Inner zone of the mineral sources protection area
  • 9-storey construction, with 2 basement levels
  • Building area approx. 45 m x 45 m
  • The construction is crossed by an S-Bahn tunnel at basement level

Our services

  • Investigation of subsoil using core drillings, excavator prospecting works and geophysics (magnetic and 2D geoelectrical analysis)
  • Assessment of subsoil and advice on foundations
  • Investigations into previous construction/underground facilities
   

Constructing a care home, Witten

Developer

Boecker Stiftung, Witten

Dr. Spang GmbH

Download the project description
Dr. Spang GmbH PDF, 162 KByte

Project

  • New construction of a care home on the site of the former civic swimming pool, Witten
  • Underground parking and separate residential unit
  • Area 73 m x 13 m
  • Five overground levels, in part with cellars underneath
  • Mixed spread and pillar foundations

Our services

  • Investigation and assessment of subsoil
  • Advice on foundations; investigation as to continuing use of the existing foundations for the town’s swimming pool
  • Risk assessment in respect of previously polluted areas
  • Percolation report
  • Investigations due to possible underground contamination

nach oben TOP

 
Dr. Spang GmbH

Witten

Phone: + 49 (0)2302 - 9 14 02 -0
Fax:  + 49 (0)2302 - 9 14 02 -20
E-Mail zentrale@dr-spang.de

Esslingen/Neckar

Phone: + 49 (0)711 - 351 30 49 -0
Fax:  + 49 (0)711 - 351 30 49 -19
E-Mail esslingen@dr-spang.de

Freiberg/Saxony

Phone: + 49 (0)3731 - 79 87 89 -0
Fax:  + 49 (0)3731 - 79 87 89 -20
E-Mail freiberg@dr-spang.de

Nuremberg

Phone: + 49 (0)911 - 9 64 56 65-0
Fax:  + 49 (0)911 - 9 64 56 65-5
E-Mail nuernberg@dr-spang.de

Naumburg/Saale

Phone: + 49 (0)3445 - 76 21 53
Fax:  + 49 (0)3445 - 76 21 62
E-Mail naumburg@dr-spang.de

Download

Project descriptions